Tuesday, September 22, 2026
No Result
View All Result
News Den Nigeria
  • HOME
  • NEWS
    • NIGERIA
    • AFRICA
    • WORLD
  • POLITICS
  • BUSINESS
  • SHOWBIZ
  • EDUCATION
  • HEALTH
  • TECHNOLOGY
  • SPORTS
  • OPINION
  • MORE
    • FEATURES
    • INTERVIEWS
    • RELIGION
    • RELATIONSHIP
    • VIDEOS
  • HOME
  • NEWS
    • NIGERIA
    • AFRICA
    • WORLD
  • POLITICS
  • BUSINESS
  • SHOWBIZ
  • EDUCATION
  • HEALTH
  • TECHNOLOGY
  • SPORTS
  • OPINION
  • MORE
    • FEATURES
    • INTERVIEWS
    • RELIGION
    • RELATIONSHIP
    • VIDEOS
No Result
View All Result
News Den Nigeria
No Result
View All Result

Oborevwori flags-off construction of N78bn Effurun/Warri flyovers

by NewsDen Publishers
November 27, 2023
in NEWS, NIGERIA, POLITICS
0
Oborevwori flags-off construction of N78bn Effurun/Warri flyovers
Share on FacebookShare on TwitterShare on WhatsappSend to Email
Delta State Governor, Rt. Hon. Sheriff Oborevwori, Monday, performed the groundbreaking ceremony for the construction of three flyovers, cloverleaf, road expansion and pedestrian bridges in the Effurun and Warri metropolis of the state.
The projects include road expansion and improvement works between Effurun and DSC roundabouts; PTI Junction Flyover; DSC Roundabout flyover; Enerhen junction/Marine Gate flyover and cloverleaf at Effurun roundabout.

Performing the groundbreaking ceremony in Effurun, Uvwie Local Government Area of the state, Governor Oborevwori said it was a fulfillment of the promise he made to the people of the state during his inauguration on May 29.

He said the projects would ease traffic gridlock and vehicular movements in the affected areas, adding that it would change the face of the twin cities of Effurun and Warri.

The Governor added that the projects would create employment and improve economic activities for engineers, artisans, labourers, food vendors, suppliers, transporters, quarry operators and so many others in the construction value chain.

Governor Oborevwori, said: “We have released the agreed sum as advance payment to the contractor, which on its part commenced surveys, final designs, sub-soil tests, and other activities precedent to the commencement of actual construction works. These are in addition to the establishment of site yards, offices, and life camps.

“The cumulative contract sum for the four projects is seventy-seven billion, nine hundred and ninety-seven million, one hundred and fifty-nine thousand, three hundred and thirty-nine-naira, and ninety-one kobo (N77,997,159,339.91) only and the contractor has a completion period of twenty-seven-months.

“These four strategic projects are aimed at solving the gridlock often experienced between Effurun Roundabout, through PTI Road Junction to DSC Roundabout on the Effurun/Patani (East/West) Highway at Effurun. They will also ease vehicular movement at the stretch from Enerhen Junction, Effurun to Marine Gate, Warri, in Uvwie and Warri South Local Government Areas.

“As I said during the contract signing ceremony, these projects will not only change the face of the Warri-Effurun Metropolis, they will also ease the traffic congestion in the area and alleviate the hardship faced by commuters.”

“I urge the contractor to work relentlessly to meet the schedule we have agreed to. The immediate communities and their leaders should appreciate the enormous investment the government is making and join hands with us to ensure the speedy completion of these projects.

“Let me conclude by saying that the projects commencing today underscores our commitment and determination to improve road and transport infrastructure as contained in the MORE Agenda of this administration.

“We shall continue to aggressively upgrade them across the three senatorial districts in the state as this will drive development in other sectors,” Oborevwori said.

Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze lauded Governor Oborevwori for the vision in executing the projects, noting that it was the first time in the history of the state Julius Berger was executing projects for the State Government.

Managing Director of Julius Berger Nigeria Plc, Mr. Lars Richter,  commended the State Government for the vision and insight in investing in the special infrastructure in the twin-cities and thanked Governor Oborevwori for finding the company worthy to execute the projects.

He assured that the company will deliver the work on schedule and in line with specifications.

On his part, the Ovie of Uvwie Kingdom, HRM Dr Emmanuel Sideso, Abe I, commended Governor Oborevwori for the project and for remembering the Uvwie people, assuring that they would protect the project.

Also speaking,  the Olu of Warri Kingdom, Ogiame Atuwatse III, represented by Dr Roland Oritsejafor, described the project as a project of unity and pledged the unalloyed support of the people of Warri towards successful completion of the projects.

The Chairmen of Uvwie and Warri South Local Government Areas, Hon. Ransom Onoyake and Dr Michael Tidi, respectively, in their remarks, said the people of the area are happy with the project delivery efforts of Governor Oborevwori and would cooperate with the contractor to ensure prompt delivery.

It would be recalled that the State Executive Council at its inaugural meeting on September 12, approved the contract while the contract signing ceremony was held October 18.

Maris School Admission Maris School Admission Maris School Admission
ADVERTISEMENT
Delta State Governor, Rt. Hon. Sheriff Oborevwori, Monday, performed the groundbreaking ceremony for the construction of three flyovers, cloverleaf, road expansion and pedestrian bridges in the Effurun and Warri metropolis of the state.
The projects include road expansion and improvement works between Effurun and DSC roundabouts; PTI Junction Flyover; DSC Roundabout flyover; Enerhen junction/Marine Gate flyover and cloverleaf at Effurun roundabout.

Performing the groundbreaking ceremony in Effurun, Uvwie Local Government Area of the state, Governor Oborevwori said it was a fulfillment of the promise he made to the people of the state during his inauguration on May 29.

He said the projects would ease traffic gridlock and vehicular movements in the affected areas, adding that it would change the face of the twin cities of Effurun and Warri.

The Governor added that the projects would create employment and improve economic activities for engineers, artisans, labourers, food vendors, suppliers, transporters, quarry operators and so many others in the construction value chain.

Governor Oborevwori, said: “We have released the agreed sum as advance payment to the contractor, which on its part commenced surveys, final designs, sub-soil tests, and other activities precedent to the commencement of actual construction works. These are in addition to the establishment of site yards, offices, and life camps.

“The cumulative contract sum for the four projects is seventy-seven billion, nine hundred and ninety-seven million, one hundred and fifty-nine thousand, three hundred and thirty-nine-naira, and ninety-one kobo (N77,997,159,339.91) only and the contractor has a completion period of twenty-seven-months.

“These four strategic projects are aimed at solving the gridlock often experienced between Effurun Roundabout, through PTI Road Junction to DSC Roundabout on the Effurun/Patani (East/West) Highway at Effurun. They will also ease vehicular movement at the stretch from Enerhen Junction, Effurun to Marine Gate, Warri, in Uvwie and Warri South Local Government Areas.

“As I said during the contract signing ceremony, these projects will not only change the face of the Warri-Effurun Metropolis, they will also ease the traffic congestion in the area and alleviate the hardship faced by commuters.”

“I urge the contractor to work relentlessly to meet the schedule we have agreed to. The immediate communities and their leaders should appreciate the enormous investment the government is making and join hands with us to ensure the speedy completion of these projects.

“Let me conclude by saying that the projects commencing today underscores our commitment and determination to improve road and transport infrastructure as contained in the MORE Agenda of this administration.

“We shall continue to aggressively upgrade them across the three senatorial districts in the state as this will drive development in other sectors,” Oborevwori said.

Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze lauded Governor Oborevwori for the vision in executing the projects, noting that it was the first time in the history of the state Julius Berger was executing projects for the State Government.

Managing Director of Julius Berger Nigeria Plc, Mr. Lars Richter,  commended the State Government for the vision and insight in investing in the special infrastructure in the twin-cities and thanked Governor Oborevwori for finding the company worthy to execute the projects.

He assured that the company will deliver the work on schedule and in line with specifications.

On his part, the Ovie of Uvwie Kingdom, HRM Dr Emmanuel Sideso, Abe I, commended Governor Oborevwori for the project and for remembering the Uvwie people, assuring that they would protect the project.

Also speaking,  the Olu of Warri Kingdom, Ogiame Atuwatse III, represented by Dr Roland Oritsejafor, described the project as a project of unity and pledged the unalloyed support of the people of Warri towards successful completion of the projects.

The Chairmen of Uvwie and Warri South Local Government Areas, Hon. Ransom Onoyake and Dr Michael Tidi, respectively, in their remarks, said the people of the area are happy with the project delivery efforts of Governor Oborevwori and would cooperate with the contractor to ensure prompt delivery.

It would be recalled that the State Executive Council at its inaugural meeting on September 12, approved the contract while the contract signing ceremony was held October 18.

Delta State Governor, Rt. Hon. Sheriff Oborevwori, Monday, performed the groundbreaking ceremony for the construction of three flyovers, cloverleaf, road expansion and pedestrian bridges in the Effurun and Warri metropolis of the state.
The projects include road expansion and improvement works between Effurun and DSC roundabouts; PTI Junction Flyover; DSC Roundabout flyover; Enerhen junction/Marine Gate flyover and cloverleaf at Effurun roundabout.

Performing the groundbreaking ceremony in Effurun, Uvwie Local Government Area of the state, Governor Oborevwori said it was a fulfillment of the promise he made to the people of the state during his inauguration on May 29.

He said the projects would ease traffic gridlock and vehicular movements in the affected areas, adding that it would change the face of the twin cities of Effurun and Warri.

The Governor added that the projects would create employment and improve economic activities for engineers, artisans, labourers, food vendors, suppliers, transporters, quarry operators and so many others in the construction value chain.

Governor Oborevwori, said: “We have released the agreed sum as advance payment to the contractor, which on its part commenced surveys, final designs, sub-soil tests, and other activities precedent to the commencement of actual construction works. These are in addition to the establishment of site yards, offices, and life camps.

“The cumulative contract sum for the four projects is seventy-seven billion, nine hundred and ninety-seven million, one hundred and fifty-nine thousand, three hundred and thirty-nine-naira, and ninety-one kobo (N77,997,159,339.91) only and the contractor has a completion period of twenty-seven-months.

“These four strategic projects are aimed at solving the gridlock often experienced between Effurun Roundabout, through PTI Road Junction to DSC Roundabout on the Effurun/Patani (East/West) Highway at Effurun. They will also ease vehicular movement at the stretch from Enerhen Junction, Effurun to Marine Gate, Warri, in Uvwie and Warri South Local Government Areas.

“As I said during the contract signing ceremony, these projects will not only change the face of the Warri-Effurun Metropolis, they will also ease the traffic congestion in the area and alleviate the hardship faced by commuters.”

“I urge the contractor to work relentlessly to meet the schedule we have agreed to. The immediate communities and their leaders should appreciate the enormous investment the government is making and join hands with us to ensure the speedy completion of these projects.

“Let me conclude by saying that the projects commencing today underscores our commitment and determination to improve road and transport infrastructure as contained in the MORE Agenda of this administration.

“We shall continue to aggressively upgrade them across the three senatorial districts in the state as this will drive development in other sectors,” Oborevwori said.

Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze lauded Governor Oborevwori for the vision in executing the projects, noting that it was the first time in the history of the state Julius Berger was executing projects for the State Government.

Managing Director of Julius Berger Nigeria Plc, Mr. Lars Richter,  commended the State Government for the vision and insight in investing in the special infrastructure in the twin-cities and thanked Governor Oborevwori for finding the company worthy to execute the projects.

He assured that the company will deliver the work on schedule and in line with specifications.

On his part, the Ovie of Uvwie Kingdom, HRM Dr Emmanuel Sideso, Abe I, commended Governor Oborevwori for the project and for remembering the Uvwie people, assuring that they would protect the project.

Also speaking,  the Olu of Warri Kingdom, Ogiame Atuwatse III, represented by Dr Roland Oritsejafor, described the project as a project of unity and pledged the unalloyed support of the people of Warri towards successful completion of the projects.

The Chairmen of Uvwie and Warri South Local Government Areas, Hon. Ransom Onoyake and Dr Michael Tidi, respectively, in their remarks, said the people of the area are happy with the project delivery efforts of Governor Oborevwori and would cooperate with the contractor to ensure prompt delivery.

It would be recalled that the State Executive Council at its inaugural meeting on September 12, approved the contract while the contract signing ceremony was held October 18.

Maris School Admission Maris School Admission Maris School Admission
ADVERTISEMENT
Delta State Governor, Rt. Hon. Sheriff Oborevwori, Monday, performed the groundbreaking ceremony for the construction of three flyovers, cloverleaf, road expansion and pedestrian bridges in the Effurun and Warri metropolis of the state.
The projects include road expansion and improvement works between Effurun and DSC roundabouts; PTI Junction Flyover; DSC Roundabout flyover; Enerhen junction/Marine Gate flyover and cloverleaf at Effurun roundabout.

Performing the groundbreaking ceremony in Effurun, Uvwie Local Government Area of the state, Governor Oborevwori said it was a fulfillment of the promise he made to the people of the state during his inauguration on May 29.

He said the projects would ease traffic gridlock and vehicular movements in the affected areas, adding that it would change the face of the twin cities of Effurun and Warri.

The Governor added that the projects would create employment and improve economic activities for engineers, artisans, labourers, food vendors, suppliers, transporters, quarry operators and so many others in the construction value chain.

Governor Oborevwori, said: “We have released the agreed sum as advance payment to the contractor, which on its part commenced surveys, final designs, sub-soil tests, and other activities precedent to the commencement of actual construction works. These are in addition to the establishment of site yards, offices, and life camps.

“The cumulative contract sum for the four projects is seventy-seven billion, nine hundred and ninety-seven million, one hundred and fifty-nine thousand, three hundred and thirty-nine-naira, and ninety-one kobo (N77,997,159,339.91) only and the contractor has a completion period of twenty-seven-months.

“These four strategic projects are aimed at solving the gridlock often experienced between Effurun Roundabout, through PTI Road Junction to DSC Roundabout on the Effurun/Patani (East/West) Highway at Effurun. They will also ease vehicular movement at the stretch from Enerhen Junction, Effurun to Marine Gate, Warri, in Uvwie and Warri South Local Government Areas.

“As I said during the contract signing ceremony, these projects will not only change the face of the Warri-Effurun Metropolis, they will also ease the traffic congestion in the area and alleviate the hardship faced by commuters.”

“I urge the contractor to work relentlessly to meet the schedule we have agreed to. The immediate communities and their leaders should appreciate the enormous investment the government is making and join hands with us to ensure the speedy completion of these projects.

“Let me conclude by saying that the projects commencing today underscores our commitment and determination to improve road and transport infrastructure as contained in the MORE Agenda of this administration.

“We shall continue to aggressively upgrade them across the three senatorial districts in the state as this will drive development in other sectors,” Oborevwori said.

Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze lauded Governor Oborevwori for the vision in executing the projects, noting that it was the first time in the history of the state Julius Berger was executing projects for the State Government.

Managing Director of Julius Berger Nigeria Plc, Mr. Lars Richter,  commended the State Government for the vision and insight in investing in the special infrastructure in the twin-cities and thanked Governor Oborevwori for finding the company worthy to execute the projects.

He assured that the company will deliver the work on schedule and in line with specifications.

On his part, the Ovie of Uvwie Kingdom, HRM Dr Emmanuel Sideso, Abe I, commended Governor Oborevwori for the project and for remembering the Uvwie people, assuring that they would protect the project.

Also speaking,  the Olu of Warri Kingdom, Ogiame Atuwatse III, represented by Dr Roland Oritsejafor, described the project as a project of unity and pledged the unalloyed support of the people of Warri towards successful completion of the projects.

The Chairmen of Uvwie and Warri South Local Government Areas, Hon. Ransom Onoyake and Dr Michael Tidi, respectively, in their remarks, said the people of the area are happy with the project delivery efforts of Governor Oborevwori and would cooperate with the contractor to ensure prompt delivery.

It would be recalled that the State Executive Council at its inaugural meeting on September 12, approved the contract while the contract signing ceremony was held October 18.

Delta State Governor, Rt. Hon. Sheriff Oborevwori, Monday, performed the groundbreaking ceremony for the construction of three flyovers, cloverleaf, road expansion and pedestrian bridges in the Effurun and Warri metropolis of the state.
The projects include road expansion and improvement works between Effurun and DSC roundabouts; PTI Junction Flyover; DSC Roundabout flyover; Enerhen junction/Marine Gate flyover and cloverleaf at Effurun roundabout.

Performing the groundbreaking ceremony in Effurun, Uvwie Local Government Area of the state, Governor Oborevwori said it was a fulfillment of the promise he made to the people of the state during his inauguration on May 29.

He said the projects would ease traffic gridlock and vehicular movements in the affected areas, adding that it would change the face of the twin cities of Effurun and Warri.

The Governor added that the projects would create employment and improve economic activities for engineers, artisans, labourers, food vendors, suppliers, transporters, quarry operators and so many others in the construction value chain.

Governor Oborevwori, said: “We have released the agreed sum as advance payment to the contractor, which on its part commenced surveys, final designs, sub-soil tests, and other activities precedent to the commencement of actual construction works. These are in addition to the establishment of site yards, offices, and life camps.

“The cumulative contract sum for the four projects is seventy-seven billion, nine hundred and ninety-seven million, one hundred and fifty-nine thousand, three hundred and thirty-nine-naira, and ninety-one kobo (N77,997,159,339.91) only and the contractor has a completion period of twenty-seven-months.

“These four strategic projects are aimed at solving the gridlock often experienced between Effurun Roundabout, through PTI Road Junction to DSC Roundabout on the Effurun/Patani (East/West) Highway at Effurun. They will also ease vehicular movement at the stretch from Enerhen Junction, Effurun to Marine Gate, Warri, in Uvwie and Warri South Local Government Areas.

“As I said during the contract signing ceremony, these projects will not only change the face of the Warri-Effurun Metropolis, they will also ease the traffic congestion in the area and alleviate the hardship faced by commuters.”

“I urge the contractor to work relentlessly to meet the schedule we have agreed to. The immediate communities and their leaders should appreciate the enormous investment the government is making and join hands with us to ensure the speedy completion of these projects.

“Let me conclude by saying that the projects commencing today underscores our commitment and determination to improve road and transport infrastructure as contained in the MORE Agenda of this administration.

“We shall continue to aggressively upgrade them across the three senatorial districts in the state as this will drive development in other sectors,” Oborevwori said.

Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze lauded Governor Oborevwori for the vision in executing the projects, noting that it was the first time in the history of the state Julius Berger was executing projects for the State Government.

Managing Director of Julius Berger Nigeria Plc, Mr. Lars Richter,  commended the State Government for the vision and insight in investing in the special infrastructure in the twin-cities and thanked Governor Oborevwori for finding the company worthy to execute the projects.

He assured that the company will deliver the work on schedule and in line with specifications.

On his part, the Ovie of Uvwie Kingdom, HRM Dr Emmanuel Sideso, Abe I, commended Governor Oborevwori for the project and for remembering the Uvwie people, assuring that they would protect the project.

Also speaking,  the Olu of Warri Kingdom, Ogiame Atuwatse III, represented by Dr Roland Oritsejafor, described the project as a project of unity and pledged the unalloyed support of the people of Warri towards successful completion of the projects.

The Chairmen of Uvwie and Warri South Local Government Areas, Hon. Ransom Onoyake and Dr Michael Tidi, respectively, in their remarks, said the people of the area are happy with the project delivery efforts of Governor Oborevwori and would cooperate with the contractor to ensure prompt delivery.

It would be recalled that the State Executive Council at its inaugural meeting on September 12, approved the contract while the contract signing ceremony was held October 18.

Maris School Admission Maris School Admission Maris School Admission
ADVERTISEMENT
Delta State Governor, Rt. Hon. Sheriff Oborevwori, Monday, performed the groundbreaking ceremony for the construction of three flyovers, cloverleaf, road expansion and pedestrian bridges in the Effurun and Warri metropolis of the state.
The projects include road expansion and improvement works between Effurun and DSC roundabouts; PTI Junction Flyover; DSC Roundabout flyover; Enerhen junction/Marine Gate flyover and cloverleaf at Effurun roundabout.

Performing the groundbreaking ceremony in Effurun, Uvwie Local Government Area of the state, Governor Oborevwori said it was a fulfillment of the promise he made to the people of the state during his inauguration on May 29.

He said the projects would ease traffic gridlock and vehicular movements in the affected areas, adding that it would change the face of the twin cities of Effurun and Warri.

The Governor added that the projects would create employment and improve economic activities for engineers, artisans, labourers, food vendors, suppliers, transporters, quarry operators and so many others in the construction value chain.

Governor Oborevwori, said: “We have released the agreed sum as advance payment to the contractor, which on its part commenced surveys, final designs, sub-soil tests, and other activities precedent to the commencement of actual construction works. These are in addition to the establishment of site yards, offices, and life camps.

“The cumulative contract sum for the four projects is seventy-seven billion, nine hundred and ninety-seven million, one hundred and fifty-nine thousand, three hundred and thirty-nine-naira, and ninety-one kobo (N77,997,159,339.91) only and the contractor has a completion period of twenty-seven-months.

“These four strategic projects are aimed at solving the gridlock often experienced between Effurun Roundabout, through PTI Road Junction to DSC Roundabout on the Effurun/Patani (East/West) Highway at Effurun. They will also ease vehicular movement at the stretch from Enerhen Junction, Effurun to Marine Gate, Warri, in Uvwie and Warri South Local Government Areas.

“As I said during the contract signing ceremony, these projects will not only change the face of the Warri-Effurun Metropolis, they will also ease the traffic congestion in the area and alleviate the hardship faced by commuters.”

“I urge the contractor to work relentlessly to meet the schedule we have agreed to. The immediate communities and their leaders should appreciate the enormous investment the government is making and join hands with us to ensure the speedy completion of these projects.

“Let me conclude by saying that the projects commencing today underscores our commitment and determination to improve road and transport infrastructure as contained in the MORE Agenda of this administration.

“We shall continue to aggressively upgrade them across the three senatorial districts in the state as this will drive development in other sectors,” Oborevwori said.

Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze lauded Governor Oborevwori for the vision in executing the projects, noting that it was the first time in the history of the state Julius Berger was executing projects for the State Government.

Managing Director of Julius Berger Nigeria Plc, Mr. Lars Richter,  commended the State Government for the vision and insight in investing in the special infrastructure in the twin-cities and thanked Governor Oborevwori for finding the company worthy to execute the projects.

He assured that the company will deliver the work on schedule and in line with specifications.

On his part, the Ovie of Uvwie Kingdom, HRM Dr Emmanuel Sideso, Abe I, commended Governor Oborevwori for the project and for remembering the Uvwie people, assuring that they would protect the project.

Also speaking,  the Olu of Warri Kingdom, Ogiame Atuwatse III, represented by Dr Roland Oritsejafor, described the project as a project of unity and pledged the unalloyed support of the people of Warri towards successful completion of the projects.

The Chairmen of Uvwie and Warri South Local Government Areas, Hon. Ransom Onoyake and Dr Michael Tidi, respectively, in their remarks, said the people of the area are happy with the project delivery efforts of Governor Oborevwori and would cooperate with the contractor to ensure prompt delivery.

It would be recalled that the State Executive Council at its inaugural meeting on September 12, approved the contract while the contract signing ceremony was held October 18.

Delta State Governor, Rt. Hon. Sheriff Oborevwori, Monday, performed the groundbreaking ceremony for the construction of three flyovers, cloverleaf, road expansion and pedestrian bridges in the Effurun and Warri metropolis of the state.
The projects include road expansion and improvement works between Effurun and DSC roundabouts; PTI Junction Flyover; DSC Roundabout flyover; Enerhen junction/Marine Gate flyover and cloverleaf at Effurun roundabout.

Performing the groundbreaking ceremony in Effurun, Uvwie Local Government Area of the state, Governor Oborevwori said it was a fulfillment of the promise he made to the people of the state during his inauguration on May 29.

He said the projects would ease traffic gridlock and vehicular movements in the affected areas, adding that it would change the face of the twin cities of Effurun and Warri.

The Governor added that the projects would create employment and improve economic activities for engineers, artisans, labourers, food vendors, suppliers, transporters, quarry operators and so many others in the construction value chain.

Governor Oborevwori, said: “We have released the agreed sum as advance payment to the contractor, which on its part commenced surveys, final designs, sub-soil tests, and other activities precedent to the commencement of actual construction works. These are in addition to the establishment of site yards, offices, and life camps.

“The cumulative contract sum for the four projects is seventy-seven billion, nine hundred and ninety-seven million, one hundred and fifty-nine thousand, three hundred and thirty-nine-naira, and ninety-one kobo (N77,997,159,339.91) only and the contractor has a completion period of twenty-seven-months.

“These four strategic projects are aimed at solving the gridlock often experienced between Effurun Roundabout, through PTI Road Junction to DSC Roundabout on the Effurun/Patani (East/West) Highway at Effurun. They will also ease vehicular movement at the stretch from Enerhen Junction, Effurun to Marine Gate, Warri, in Uvwie and Warri South Local Government Areas.

“As I said during the contract signing ceremony, these projects will not only change the face of the Warri-Effurun Metropolis, they will also ease the traffic congestion in the area and alleviate the hardship faced by commuters.”

“I urge the contractor to work relentlessly to meet the schedule we have agreed to. The immediate communities and their leaders should appreciate the enormous investment the government is making and join hands with us to ensure the speedy completion of these projects.

“Let me conclude by saying that the projects commencing today underscores our commitment and determination to improve road and transport infrastructure as contained in the MORE Agenda of this administration.

“We shall continue to aggressively upgrade them across the three senatorial districts in the state as this will drive development in other sectors,” Oborevwori said.

Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze lauded Governor Oborevwori for the vision in executing the projects, noting that it was the first time in the history of the state Julius Berger was executing projects for the State Government.

Managing Director of Julius Berger Nigeria Plc, Mr. Lars Richter,  commended the State Government for the vision and insight in investing in the special infrastructure in the twin-cities and thanked Governor Oborevwori for finding the company worthy to execute the projects.

He assured that the company will deliver the work on schedule and in line with specifications.

On his part, the Ovie of Uvwie Kingdom, HRM Dr Emmanuel Sideso, Abe I, commended Governor Oborevwori for the project and for remembering the Uvwie people, assuring that they would protect the project.

Also speaking,  the Olu of Warri Kingdom, Ogiame Atuwatse III, represented by Dr Roland Oritsejafor, described the project as a project of unity and pledged the unalloyed support of the people of Warri towards successful completion of the projects.

The Chairmen of Uvwie and Warri South Local Government Areas, Hon. Ransom Onoyake and Dr Michael Tidi, respectively, in their remarks, said the people of the area are happy with the project delivery efforts of Governor Oborevwori and would cooperate with the contractor to ensure prompt delivery.

It would be recalled that the State Executive Council at its inaugural meeting on September 12, approved the contract while the contract signing ceremony was held October 18.

Maris School Admission Maris School Admission Maris School Admission
ADVERTISEMENT
Delta State Governor, Rt. Hon. Sheriff Oborevwori, Monday, performed the groundbreaking ceremony for the construction of three flyovers, cloverleaf, road expansion and pedestrian bridges in the Effurun and Warri metropolis of the state.
The projects include road expansion and improvement works between Effurun and DSC roundabouts; PTI Junction Flyover; DSC Roundabout flyover; Enerhen junction/Marine Gate flyover and cloverleaf at Effurun roundabout.

Performing the groundbreaking ceremony in Effurun, Uvwie Local Government Area of the state, Governor Oborevwori said it was a fulfillment of the promise he made to the people of the state during his inauguration on May 29.

He said the projects would ease traffic gridlock and vehicular movements in the affected areas, adding that it would change the face of the twin cities of Effurun and Warri.

The Governor added that the projects would create employment and improve economic activities for engineers, artisans, labourers, food vendors, suppliers, transporters, quarry operators and so many others in the construction value chain.

Governor Oborevwori, said: “We have released the agreed sum as advance payment to the contractor, which on its part commenced surveys, final designs, sub-soil tests, and other activities precedent to the commencement of actual construction works. These are in addition to the establishment of site yards, offices, and life camps.

“The cumulative contract sum for the four projects is seventy-seven billion, nine hundred and ninety-seven million, one hundred and fifty-nine thousand, three hundred and thirty-nine-naira, and ninety-one kobo (N77,997,159,339.91) only and the contractor has a completion period of twenty-seven-months.

“These four strategic projects are aimed at solving the gridlock often experienced between Effurun Roundabout, through PTI Road Junction to DSC Roundabout on the Effurun/Patani (East/West) Highway at Effurun. They will also ease vehicular movement at the stretch from Enerhen Junction, Effurun to Marine Gate, Warri, in Uvwie and Warri South Local Government Areas.

“As I said during the contract signing ceremony, these projects will not only change the face of the Warri-Effurun Metropolis, they will also ease the traffic congestion in the area and alleviate the hardship faced by commuters.”

“I urge the contractor to work relentlessly to meet the schedule we have agreed to. The immediate communities and their leaders should appreciate the enormous investment the government is making and join hands with us to ensure the speedy completion of these projects.

“Let me conclude by saying that the projects commencing today underscores our commitment and determination to improve road and transport infrastructure as contained in the MORE Agenda of this administration.

“We shall continue to aggressively upgrade them across the three senatorial districts in the state as this will drive development in other sectors,” Oborevwori said.

Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze lauded Governor Oborevwori for the vision in executing the projects, noting that it was the first time in the history of the state Julius Berger was executing projects for the State Government.

Managing Director of Julius Berger Nigeria Plc, Mr. Lars Richter,  commended the State Government for the vision and insight in investing in the special infrastructure in the twin-cities and thanked Governor Oborevwori for finding the company worthy to execute the projects.

He assured that the company will deliver the work on schedule and in line with specifications.

On his part, the Ovie of Uvwie Kingdom, HRM Dr Emmanuel Sideso, Abe I, commended Governor Oborevwori for the project and for remembering the Uvwie people, assuring that they would protect the project.

Also speaking,  the Olu of Warri Kingdom, Ogiame Atuwatse III, represented by Dr Roland Oritsejafor, described the project as a project of unity and pledged the unalloyed support of the people of Warri towards successful completion of the projects.

The Chairmen of Uvwie and Warri South Local Government Areas, Hon. Ransom Onoyake and Dr Michael Tidi, respectively, in their remarks, said the people of the area are happy with the project delivery efforts of Governor Oborevwori and would cooperate with the contractor to ensure prompt delivery.

It would be recalled that the State Executive Council at its inaugural meeting on September 12, approved the contract while the contract signing ceremony was held October 18.

AlsoRead

Delta Govt Conducts Pre-Handover Inspection Of DSC Roundabout Flyover

Oborevwori Flags Off N59.7bn Agbor/Uromi Junction Flyover

Oborevwori To Flag Off Construction Of N59.7 Billion Agbor Flyover Project Jan 19

Delta State Governor, Rt. Hon. Sheriff Oborevwori, Monday, performed the groundbreaking ceremony for the construction of three flyovers, cloverleaf, road expansion and pedestrian bridges in the Effurun and Warri metropolis of the state.
The projects include road expansion and improvement works between Effurun and DSC roundabouts; PTI Junction Flyover; DSC Roundabout flyover; Enerhen junction/Marine Gate flyover and cloverleaf at Effurun roundabout.

Performing the groundbreaking ceremony in Effurun, Uvwie Local Government Area of the state, Governor Oborevwori said it was a fulfillment of the promise he made to the people of the state during his inauguration on May 29.

He said the projects would ease traffic gridlock and vehicular movements in the affected areas, adding that it would change the face of the twin cities of Effurun and Warri.

The Governor added that the projects would create employment and improve economic activities for engineers, artisans, labourers, food vendors, suppliers, transporters, quarry operators and so many others in the construction value chain.

Governor Oborevwori, said: “We have released the agreed sum as advance payment to the contractor, which on its part commenced surveys, final designs, sub-soil tests, and other activities precedent to the commencement of actual construction works. These are in addition to the establishment of site yards, offices, and life camps.

“The cumulative contract sum for the four projects is seventy-seven billion, nine hundred and ninety-seven million, one hundred and fifty-nine thousand, three hundred and thirty-nine-naira, and ninety-one kobo (N77,997,159,339.91) only and the contractor has a completion period of twenty-seven-months.

“These four strategic projects are aimed at solving the gridlock often experienced between Effurun Roundabout, through PTI Road Junction to DSC Roundabout on the Effurun/Patani (East/West) Highway at Effurun. They will also ease vehicular movement at the stretch from Enerhen Junction, Effurun to Marine Gate, Warri, in Uvwie and Warri South Local Government Areas.

“As I said during the contract signing ceremony, these projects will not only change the face of the Warri-Effurun Metropolis, they will also ease the traffic congestion in the area and alleviate the hardship faced by commuters.”

“I urge the contractor to work relentlessly to meet the schedule we have agreed to. The immediate communities and their leaders should appreciate the enormous investment the government is making and join hands with us to ensure the speedy completion of these projects.

“Let me conclude by saying that the projects commencing today underscores our commitment and determination to improve road and transport infrastructure as contained in the MORE Agenda of this administration.

“We shall continue to aggressively upgrade them across the three senatorial districts in the state as this will drive development in other sectors,” Oborevwori said.

Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze lauded Governor Oborevwori for the vision in executing the projects, noting that it was the first time in the history of the state Julius Berger was executing projects for the State Government.

Managing Director of Julius Berger Nigeria Plc, Mr. Lars Richter,  commended the State Government for the vision and insight in investing in the special infrastructure in the twin-cities and thanked Governor Oborevwori for finding the company worthy to execute the projects.

He assured that the company will deliver the work on schedule and in line with specifications.

On his part, the Ovie of Uvwie Kingdom, HRM Dr Emmanuel Sideso, Abe I, commended Governor Oborevwori for the project and for remembering the Uvwie people, assuring that they would protect the project.

Also speaking,  the Olu of Warri Kingdom, Ogiame Atuwatse III, represented by Dr Roland Oritsejafor, described the project as a project of unity and pledged the unalloyed support of the people of Warri towards successful completion of the projects.

The Chairmen of Uvwie and Warri South Local Government Areas, Hon. Ransom Onoyake and Dr Michael Tidi, respectively, in their remarks, said the people of the area are happy with the project delivery efforts of Governor Oborevwori and would cooperate with the contractor to ensure prompt delivery.

It would be recalled that the State Executive Council at its inaugural meeting on September 12, approved the contract while the contract signing ceremony was held October 18.

Maris School Admission Maris School Admission Maris School Admission
ADVERTISEMENT
Delta State Governor, Rt. Hon. Sheriff Oborevwori, Monday, performed the groundbreaking ceremony for the construction of three flyovers, cloverleaf, road expansion and pedestrian bridges in the Effurun and Warri metropolis of the state.
The projects include road expansion and improvement works between Effurun and DSC roundabouts; PTI Junction Flyover; DSC Roundabout flyover; Enerhen junction/Marine Gate flyover and cloverleaf at Effurun roundabout.

Performing the groundbreaking ceremony in Effurun, Uvwie Local Government Area of the state, Governor Oborevwori said it was a fulfillment of the promise he made to the people of the state during his inauguration on May 29.

He said the projects would ease traffic gridlock and vehicular movements in the affected areas, adding that it would change the face of the twin cities of Effurun and Warri.

The Governor added that the projects would create employment and improve economic activities for engineers, artisans, labourers, food vendors, suppliers, transporters, quarry operators and so many others in the construction value chain.

Governor Oborevwori, said: “We have released the agreed sum as advance payment to the contractor, which on its part commenced surveys, final designs, sub-soil tests, and other activities precedent to the commencement of actual construction works. These are in addition to the establishment of site yards, offices, and life camps.

“The cumulative contract sum for the four projects is seventy-seven billion, nine hundred and ninety-seven million, one hundred and fifty-nine thousand, three hundred and thirty-nine-naira, and ninety-one kobo (N77,997,159,339.91) only and the contractor has a completion period of twenty-seven-months.

“These four strategic projects are aimed at solving the gridlock often experienced between Effurun Roundabout, through PTI Road Junction to DSC Roundabout on the Effurun/Patani (East/West) Highway at Effurun. They will also ease vehicular movement at the stretch from Enerhen Junction, Effurun to Marine Gate, Warri, in Uvwie and Warri South Local Government Areas.

“As I said during the contract signing ceremony, these projects will not only change the face of the Warri-Effurun Metropolis, they will also ease the traffic congestion in the area and alleviate the hardship faced by commuters.”

“I urge the contractor to work relentlessly to meet the schedule we have agreed to. The immediate communities and their leaders should appreciate the enormous investment the government is making and join hands with us to ensure the speedy completion of these projects.

“Let me conclude by saying that the projects commencing today underscores our commitment and determination to improve road and transport infrastructure as contained in the MORE Agenda of this administration.

“We shall continue to aggressively upgrade them across the three senatorial districts in the state as this will drive development in other sectors,” Oborevwori said.

Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze lauded Governor Oborevwori for the vision in executing the projects, noting that it was the first time in the history of the state Julius Berger was executing projects for the State Government.

Managing Director of Julius Berger Nigeria Plc, Mr. Lars Richter,  commended the State Government for the vision and insight in investing in the special infrastructure in the twin-cities and thanked Governor Oborevwori for finding the company worthy to execute the projects.

He assured that the company will deliver the work on schedule and in line with specifications.

On his part, the Ovie of Uvwie Kingdom, HRM Dr Emmanuel Sideso, Abe I, commended Governor Oborevwori for the project and for remembering the Uvwie people, assuring that they would protect the project.

Also speaking,  the Olu of Warri Kingdom, Ogiame Atuwatse III, represented by Dr Roland Oritsejafor, described the project as a project of unity and pledged the unalloyed support of the people of Warri towards successful completion of the projects.

The Chairmen of Uvwie and Warri South Local Government Areas, Hon. Ransom Onoyake and Dr Michael Tidi, respectively, in their remarks, said the people of the area are happy with the project delivery efforts of Governor Oborevwori and would cooperate with the contractor to ensure prompt delivery.

It would be recalled that the State Executive Council at its inaugural meeting on September 12, approved the contract while the contract signing ceremony was held October 18.

Delta State Governor, Rt. Hon. Sheriff Oborevwori, Monday, performed the groundbreaking ceremony for the construction of three flyovers, cloverleaf, road expansion and pedestrian bridges in the Effurun and Warri metropolis of the state.
The projects include road expansion and improvement works between Effurun and DSC roundabouts; PTI Junction Flyover; DSC Roundabout flyover; Enerhen junction/Marine Gate flyover and cloverleaf at Effurun roundabout.

Performing the groundbreaking ceremony in Effurun, Uvwie Local Government Area of the state, Governor Oborevwori said it was a fulfillment of the promise he made to the people of the state during his inauguration on May 29.

He said the projects would ease traffic gridlock and vehicular movements in the affected areas, adding that it would change the face of the twin cities of Effurun and Warri.

The Governor added that the projects would create employment and improve economic activities for engineers, artisans, labourers, food vendors, suppliers, transporters, quarry operators and so many others in the construction value chain.

Governor Oborevwori, said: “We have released the agreed sum as advance payment to the contractor, which on its part commenced surveys, final designs, sub-soil tests, and other activities precedent to the commencement of actual construction works. These are in addition to the establishment of site yards, offices, and life camps.

“The cumulative contract sum for the four projects is seventy-seven billion, nine hundred and ninety-seven million, one hundred and fifty-nine thousand, three hundred and thirty-nine-naira, and ninety-one kobo (N77,997,159,339.91) only and the contractor has a completion period of twenty-seven-months.

“These four strategic projects are aimed at solving the gridlock often experienced between Effurun Roundabout, through PTI Road Junction to DSC Roundabout on the Effurun/Patani (East/West) Highway at Effurun. They will also ease vehicular movement at the stretch from Enerhen Junction, Effurun to Marine Gate, Warri, in Uvwie and Warri South Local Government Areas.

“As I said during the contract signing ceremony, these projects will not only change the face of the Warri-Effurun Metropolis, they will also ease the traffic congestion in the area and alleviate the hardship faced by commuters.”

“I urge the contractor to work relentlessly to meet the schedule we have agreed to. The immediate communities and their leaders should appreciate the enormous investment the government is making and join hands with us to ensure the speedy completion of these projects.

“Let me conclude by saying that the projects commencing today underscores our commitment and determination to improve road and transport infrastructure as contained in the MORE Agenda of this administration.

“We shall continue to aggressively upgrade them across the three senatorial districts in the state as this will drive development in other sectors,” Oborevwori said.

Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze lauded Governor Oborevwori for the vision in executing the projects, noting that it was the first time in the history of the state Julius Berger was executing projects for the State Government.

Managing Director of Julius Berger Nigeria Plc, Mr. Lars Richter,  commended the State Government for the vision and insight in investing in the special infrastructure in the twin-cities and thanked Governor Oborevwori for finding the company worthy to execute the projects.

He assured that the company will deliver the work on schedule and in line with specifications.

On his part, the Ovie of Uvwie Kingdom, HRM Dr Emmanuel Sideso, Abe I, commended Governor Oborevwori for the project and for remembering the Uvwie people, assuring that they would protect the project.

Also speaking,  the Olu of Warri Kingdom, Ogiame Atuwatse III, represented by Dr Roland Oritsejafor, described the project as a project of unity and pledged the unalloyed support of the people of Warri towards successful completion of the projects.

The Chairmen of Uvwie and Warri South Local Government Areas, Hon. Ransom Onoyake and Dr Michael Tidi, respectively, in their remarks, said the people of the area are happy with the project delivery efforts of Governor Oborevwori and would cooperate with the contractor to ensure prompt delivery.

It would be recalled that the State Executive Council at its inaugural meeting on September 12, approved the contract while the contract signing ceremony was held October 18.

Maris School Admission Maris School Admission Maris School Admission
ADVERTISEMENT
Delta State Governor, Rt. Hon. Sheriff Oborevwori, Monday, performed the groundbreaking ceremony for the construction of three flyovers, cloverleaf, road expansion and pedestrian bridges in the Effurun and Warri metropolis of the state.
The projects include road expansion and improvement works between Effurun and DSC roundabouts; PTI Junction Flyover; DSC Roundabout flyover; Enerhen junction/Marine Gate flyover and cloverleaf at Effurun roundabout.

Performing the groundbreaking ceremony in Effurun, Uvwie Local Government Area of the state, Governor Oborevwori said it was a fulfillment of the promise he made to the people of the state during his inauguration on May 29.

He said the projects would ease traffic gridlock and vehicular movements in the affected areas, adding that it would change the face of the twin cities of Effurun and Warri.

The Governor added that the projects would create employment and improve economic activities for engineers, artisans, labourers, food vendors, suppliers, transporters, quarry operators and so many others in the construction value chain.

Governor Oborevwori, said: “We have released the agreed sum as advance payment to the contractor, which on its part commenced surveys, final designs, sub-soil tests, and other activities precedent to the commencement of actual construction works. These are in addition to the establishment of site yards, offices, and life camps.

“The cumulative contract sum for the four projects is seventy-seven billion, nine hundred and ninety-seven million, one hundred and fifty-nine thousand, three hundred and thirty-nine-naira, and ninety-one kobo (N77,997,159,339.91) only and the contractor has a completion period of twenty-seven-months.

“These four strategic projects are aimed at solving the gridlock often experienced between Effurun Roundabout, through PTI Road Junction to DSC Roundabout on the Effurun/Patani (East/West) Highway at Effurun. They will also ease vehicular movement at the stretch from Enerhen Junction, Effurun to Marine Gate, Warri, in Uvwie and Warri South Local Government Areas.

“As I said during the contract signing ceremony, these projects will not only change the face of the Warri-Effurun Metropolis, they will also ease the traffic congestion in the area and alleviate the hardship faced by commuters.”

“I urge the contractor to work relentlessly to meet the schedule we have agreed to. The immediate communities and their leaders should appreciate the enormous investment the government is making and join hands with us to ensure the speedy completion of these projects.

“Let me conclude by saying that the projects commencing today underscores our commitment and determination to improve road and transport infrastructure as contained in the MORE Agenda of this administration.

“We shall continue to aggressively upgrade them across the three senatorial districts in the state as this will drive development in other sectors,” Oborevwori said.

Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze lauded Governor Oborevwori for the vision in executing the projects, noting that it was the first time in the history of the state Julius Berger was executing projects for the State Government.

Managing Director of Julius Berger Nigeria Plc, Mr. Lars Richter,  commended the State Government for the vision and insight in investing in the special infrastructure in the twin-cities and thanked Governor Oborevwori for finding the company worthy to execute the projects.

He assured that the company will deliver the work on schedule and in line with specifications.

On his part, the Ovie of Uvwie Kingdom, HRM Dr Emmanuel Sideso, Abe I, commended Governor Oborevwori for the project and for remembering the Uvwie people, assuring that they would protect the project.

Also speaking,  the Olu of Warri Kingdom, Ogiame Atuwatse III, represented by Dr Roland Oritsejafor, described the project as a project of unity and pledged the unalloyed support of the people of Warri towards successful completion of the projects.

The Chairmen of Uvwie and Warri South Local Government Areas, Hon. Ransom Onoyake and Dr Michael Tidi, respectively, in their remarks, said the people of the area are happy with the project delivery efforts of Governor Oborevwori and would cooperate with the contractor to ensure prompt delivery.

It would be recalled that the State Executive Council at its inaugural meeting on September 12, approved the contract while the contract signing ceremony was held October 18.

Delta State Governor, Rt. Hon. Sheriff Oborevwori, Monday, performed the groundbreaking ceremony for the construction of three flyovers, cloverleaf, road expansion and pedestrian bridges in the Effurun and Warri metropolis of the state.
The projects include road expansion and improvement works between Effurun and DSC roundabouts; PTI Junction Flyover; DSC Roundabout flyover; Enerhen junction/Marine Gate flyover and cloverleaf at Effurun roundabout.

Performing the groundbreaking ceremony in Effurun, Uvwie Local Government Area of the state, Governor Oborevwori said it was a fulfillment of the promise he made to the people of the state during his inauguration on May 29.

He said the projects would ease traffic gridlock and vehicular movements in the affected areas, adding that it would change the face of the twin cities of Effurun and Warri.

The Governor added that the projects would create employment and improve economic activities for engineers, artisans, labourers, food vendors, suppliers, transporters, quarry operators and so many others in the construction value chain.

Governor Oborevwori, said: “We have released the agreed sum as advance payment to the contractor, which on its part commenced surveys, final designs, sub-soil tests, and other activities precedent to the commencement of actual construction works. These are in addition to the establishment of site yards, offices, and life camps.

“The cumulative contract sum for the four projects is seventy-seven billion, nine hundred and ninety-seven million, one hundred and fifty-nine thousand, three hundred and thirty-nine-naira, and ninety-one kobo (N77,997,159,339.91) only and the contractor has a completion period of twenty-seven-months.

“These four strategic projects are aimed at solving the gridlock often experienced between Effurun Roundabout, through PTI Road Junction to DSC Roundabout on the Effurun/Patani (East/West) Highway at Effurun. They will also ease vehicular movement at the stretch from Enerhen Junction, Effurun to Marine Gate, Warri, in Uvwie and Warri South Local Government Areas.

“As I said during the contract signing ceremony, these projects will not only change the face of the Warri-Effurun Metropolis, they will also ease the traffic congestion in the area and alleviate the hardship faced by commuters.”

“I urge the contractor to work relentlessly to meet the schedule we have agreed to. The immediate communities and their leaders should appreciate the enormous investment the government is making and join hands with us to ensure the speedy completion of these projects.

“Let me conclude by saying that the projects commencing today underscores our commitment and determination to improve road and transport infrastructure as contained in the MORE Agenda of this administration.

“We shall continue to aggressively upgrade them across the three senatorial districts in the state as this will drive development in other sectors,” Oborevwori said.

Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze lauded Governor Oborevwori for the vision in executing the projects, noting that it was the first time in the history of the state Julius Berger was executing projects for the State Government.

Managing Director of Julius Berger Nigeria Plc, Mr. Lars Richter,  commended the State Government for the vision and insight in investing in the special infrastructure in the twin-cities and thanked Governor Oborevwori for finding the company worthy to execute the projects.

He assured that the company will deliver the work on schedule and in line with specifications.

On his part, the Ovie of Uvwie Kingdom, HRM Dr Emmanuel Sideso, Abe I, commended Governor Oborevwori for the project and for remembering the Uvwie people, assuring that they would protect the project.

Also speaking,  the Olu of Warri Kingdom, Ogiame Atuwatse III, represented by Dr Roland Oritsejafor, described the project as a project of unity and pledged the unalloyed support of the people of Warri towards successful completion of the projects.

The Chairmen of Uvwie and Warri South Local Government Areas, Hon. Ransom Onoyake and Dr Michael Tidi, respectively, in their remarks, said the people of the area are happy with the project delivery efforts of Governor Oborevwori and would cooperate with the contractor to ensure prompt delivery.

It would be recalled that the State Executive Council at its inaugural meeting on September 12, approved the contract while the contract signing ceremony was held October 18.

Maris School Admission Maris School Admission Maris School Admission
ADVERTISEMENT
Delta State Governor, Rt. Hon. Sheriff Oborevwori, Monday, performed the groundbreaking ceremony for the construction of three flyovers, cloverleaf, road expansion and pedestrian bridges in the Effurun and Warri metropolis of the state.
The projects include road expansion and improvement works between Effurun and DSC roundabouts; PTI Junction Flyover; DSC Roundabout flyover; Enerhen junction/Marine Gate flyover and cloverleaf at Effurun roundabout.

Performing the groundbreaking ceremony in Effurun, Uvwie Local Government Area of the state, Governor Oborevwori said it was a fulfillment of the promise he made to the people of the state during his inauguration on May 29.

He said the projects would ease traffic gridlock and vehicular movements in the affected areas, adding that it would change the face of the twin cities of Effurun and Warri.

The Governor added that the projects would create employment and improve economic activities for engineers, artisans, labourers, food vendors, suppliers, transporters, quarry operators and so many others in the construction value chain.

Governor Oborevwori, said: “We have released the agreed sum as advance payment to the contractor, which on its part commenced surveys, final designs, sub-soil tests, and other activities precedent to the commencement of actual construction works. These are in addition to the establishment of site yards, offices, and life camps.

“The cumulative contract sum for the four projects is seventy-seven billion, nine hundred and ninety-seven million, one hundred and fifty-nine thousand, three hundred and thirty-nine-naira, and ninety-one kobo (N77,997,159,339.91) only and the contractor has a completion period of twenty-seven-months.

“These four strategic projects are aimed at solving the gridlock often experienced between Effurun Roundabout, through PTI Road Junction to DSC Roundabout on the Effurun/Patani (East/West) Highway at Effurun. They will also ease vehicular movement at the stretch from Enerhen Junction, Effurun to Marine Gate, Warri, in Uvwie and Warri South Local Government Areas.

“As I said during the contract signing ceremony, these projects will not only change the face of the Warri-Effurun Metropolis, they will also ease the traffic congestion in the area and alleviate the hardship faced by commuters.”

“I urge the contractor to work relentlessly to meet the schedule we have agreed to. The immediate communities and their leaders should appreciate the enormous investment the government is making and join hands with us to ensure the speedy completion of these projects.

“Let me conclude by saying that the projects commencing today underscores our commitment and determination to improve road and transport infrastructure as contained in the MORE Agenda of this administration.

“We shall continue to aggressively upgrade them across the three senatorial districts in the state as this will drive development in other sectors,” Oborevwori said.

Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze lauded Governor Oborevwori for the vision in executing the projects, noting that it was the first time in the history of the state Julius Berger was executing projects for the State Government.

Managing Director of Julius Berger Nigeria Plc, Mr. Lars Richter,  commended the State Government for the vision and insight in investing in the special infrastructure in the twin-cities and thanked Governor Oborevwori for finding the company worthy to execute the projects.

He assured that the company will deliver the work on schedule and in line with specifications.

On his part, the Ovie of Uvwie Kingdom, HRM Dr Emmanuel Sideso, Abe I, commended Governor Oborevwori for the project and for remembering the Uvwie people, assuring that they would protect the project.

Also speaking,  the Olu of Warri Kingdom, Ogiame Atuwatse III, represented by Dr Roland Oritsejafor, described the project as a project of unity and pledged the unalloyed support of the people of Warri towards successful completion of the projects.

The Chairmen of Uvwie and Warri South Local Government Areas, Hon. Ransom Onoyake and Dr Michael Tidi, respectively, in their remarks, said the people of the area are happy with the project delivery efforts of Governor Oborevwori and would cooperate with the contractor to ensure prompt delivery.

It would be recalled that the State Executive Council at its inaugural meeting on September 12, approved the contract while the contract signing ceremony was held October 18.

Delta State Governor, Rt. Hon. Sheriff Oborevwori, Monday, performed the groundbreaking ceremony for the construction of three flyovers, cloverleaf, road expansion and pedestrian bridges in the Effurun and Warri metropolis of the state.
The projects include road expansion and improvement works between Effurun and DSC roundabouts; PTI Junction Flyover; DSC Roundabout flyover; Enerhen junction/Marine Gate flyover and cloverleaf at Effurun roundabout.

Performing the groundbreaking ceremony in Effurun, Uvwie Local Government Area of the state, Governor Oborevwori said it was a fulfillment of the promise he made to the people of the state during his inauguration on May 29.

He said the projects would ease traffic gridlock and vehicular movements in the affected areas, adding that it would change the face of the twin cities of Effurun and Warri.

The Governor added that the projects would create employment and improve economic activities for engineers, artisans, labourers, food vendors, suppliers, transporters, quarry operators and so many others in the construction value chain.

Governor Oborevwori, said: “We have released the agreed sum as advance payment to the contractor, which on its part commenced surveys, final designs, sub-soil tests, and other activities precedent to the commencement of actual construction works. These are in addition to the establishment of site yards, offices, and life camps.

“The cumulative contract sum for the four projects is seventy-seven billion, nine hundred and ninety-seven million, one hundred and fifty-nine thousand, three hundred and thirty-nine-naira, and ninety-one kobo (N77,997,159,339.91) only and the contractor has a completion period of twenty-seven-months.

“These four strategic projects are aimed at solving the gridlock often experienced between Effurun Roundabout, through PTI Road Junction to DSC Roundabout on the Effurun/Patani (East/West) Highway at Effurun. They will also ease vehicular movement at the stretch from Enerhen Junction, Effurun to Marine Gate, Warri, in Uvwie and Warri South Local Government Areas.

“As I said during the contract signing ceremony, these projects will not only change the face of the Warri-Effurun Metropolis, they will also ease the traffic congestion in the area and alleviate the hardship faced by commuters.”

“I urge the contractor to work relentlessly to meet the schedule we have agreed to. The immediate communities and their leaders should appreciate the enormous investment the government is making and join hands with us to ensure the speedy completion of these projects.

“Let me conclude by saying that the projects commencing today underscores our commitment and determination to improve road and transport infrastructure as contained in the MORE Agenda of this administration.

“We shall continue to aggressively upgrade them across the three senatorial districts in the state as this will drive development in other sectors,” Oborevwori said.

Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze lauded Governor Oborevwori for the vision in executing the projects, noting that it was the first time in the history of the state Julius Berger was executing projects for the State Government.

Managing Director of Julius Berger Nigeria Plc, Mr. Lars Richter,  commended the State Government for the vision and insight in investing in the special infrastructure in the twin-cities and thanked Governor Oborevwori for finding the company worthy to execute the projects.

He assured that the company will deliver the work on schedule and in line with specifications.

On his part, the Ovie of Uvwie Kingdom, HRM Dr Emmanuel Sideso, Abe I, commended Governor Oborevwori for the project and for remembering the Uvwie people, assuring that they would protect the project.

Also speaking,  the Olu of Warri Kingdom, Ogiame Atuwatse III, represented by Dr Roland Oritsejafor, described the project as a project of unity and pledged the unalloyed support of the people of Warri towards successful completion of the projects.

The Chairmen of Uvwie and Warri South Local Government Areas, Hon. Ransom Onoyake and Dr Michael Tidi, respectively, in their remarks, said the people of the area are happy with the project delivery efforts of Governor Oborevwori and would cooperate with the contractor to ensure prompt delivery.

It would be recalled that the State Executive Council at its inaugural meeting on September 12, approved the contract while the contract signing ceremony was held October 18.

Maris School Admission Maris School Admission Maris School Admission
ADVERTISEMENT
Delta State Governor, Rt. Hon. Sheriff Oborevwori, Monday, performed the groundbreaking ceremony for the construction of three flyovers, cloverleaf, road expansion and pedestrian bridges in the Effurun and Warri metropolis of the state.
The projects include road expansion and improvement works between Effurun and DSC roundabouts; PTI Junction Flyover; DSC Roundabout flyover; Enerhen junction/Marine Gate flyover and cloverleaf at Effurun roundabout.

Performing the groundbreaking ceremony in Effurun, Uvwie Local Government Area of the state, Governor Oborevwori said it was a fulfillment of the promise he made to the people of the state during his inauguration on May 29.

He said the projects would ease traffic gridlock and vehicular movements in the affected areas, adding that it would change the face of the twin cities of Effurun and Warri.

The Governor added that the projects would create employment and improve economic activities for engineers, artisans, labourers, food vendors, suppliers, transporters, quarry operators and so many others in the construction value chain.

Governor Oborevwori, said: “We have released the agreed sum as advance payment to the contractor, which on its part commenced surveys, final designs, sub-soil tests, and other activities precedent to the commencement of actual construction works. These are in addition to the establishment of site yards, offices, and life camps.

“The cumulative contract sum for the four projects is seventy-seven billion, nine hundred and ninety-seven million, one hundred and fifty-nine thousand, three hundred and thirty-nine-naira, and ninety-one kobo (N77,997,159,339.91) only and the contractor has a completion period of twenty-seven-months.

“These four strategic projects are aimed at solving the gridlock often experienced between Effurun Roundabout, through PTI Road Junction to DSC Roundabout on the Effurun/Patani (East/West) Highway at Effurun. They will also ease vehicular movement at the stretch from Enerhen Junction, Effurun to Marine Gate, Warri, in Uvwie and Warri South Local Government Areas.

“As I said during the contract signing ceremony, these projects will not only change the face of the Warri-Effurun Metropolis, they will also ease the traffic congestion in the area and alleviate the hardship faced by commuters.”

“I urge the contractor to work relentlessly to meet the schedule we have agreed to. The immediate communities and their leaders should appreciate the enormous investment the government is making and join hands with us to ensure the speedy completion of these projects.

“Let me conclude by saying that the projects commencing today underscores our commitment and determination to improve road and transport infrastructure as contained in the MORE Agenda of this administration.

“We shall continue to aggressively upgrade them across the three senatorial districts in the state as this will drive development in other sectors,” Oborevwori said.

Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze lauded Governor Oborevwori for the vision in executing the projects, noting that it was the first time in the history of the state Julius Berger was executing projects for the State Government.

Managing Director of Julius Berger Nigeria Plc, Mr. Lars Richter,  commended the State Government for the vision and insight in investing in the special infrastructure in the twin-cities and thanked Governor Oborevwori for finding the company worthy to execute the projects.

He assured that the company will deliver the work on schedule and in line with specifications.

On his part, the Ovie of Uvwie Kingdom, HRM Dr Emmanuel Sideso, Abe I, commended Governor Oborevwori for the project and for remembering the Uvwie people, assuring that they would protect the project.

Also speaking,  the Olu of Warri Kingdom, Ogiame Atuwatse III, represented by Dr Roland Oritsejafor, described the project as a project of unity and pledged the unalloyed support of the people of Warri towards successful completion of the projects.

The Chairmen of Uvwie and Warri South Local Government Areas, Hon. Ransom Onoyake and Dr Michael Tidi, respectively, in their remarks, said the people of the area are happy with the project delivery efforts of Governor Oborevwori and would cooperate with the contractor to ensure prompt delivery.

It would be recalled that the State Executive Council at its inaugural meeting on September 12, approved the contract while the contract signing ceremony was held October 18.

ShareTweetSendSend
Previous Post

Shaibu formally declares for Edo guber race

Next Post

Oborevwori Set To Inaugurate Board Members Of Eight Agencies

Related Posts

Oborevwori To Swear In New Set Of Political Appointees 
NEWS

Oborevwori To Swear In New Set Of Political Appointees 

by NewsDen Publishers
September 21, 2026
Oborevwori Celebrates Oluremi Tinubu at 66, Hails Support for Vulnerable Nigerians
NEWS

Oborevwori Celebrates Oluremi Tinubu at 66, Hails Support for Vulnerable Nigerians

by NewsDen Publishers
September 21, 2026
Fr. Mozia Urges Christians To Align Their Will With God’s Will
NEWS

Fr. Mozia Urges Christians To Align Their Will With God’s Will

by NewsDen Publishers
September 20, 2026
2027: Ndokwa Nation Adopts Tinubu, Oborevwori, Okowa, Other APC Candidates
NEWS

2027: Ndokwa Nation Adopts Tinubu, Oborevwori, Okowa, Other APC Candidates

by NewsDen Publishers
September 19, 2026
Conservation foundation urges businesses to champion environmental sustainability, biodiversity in Nigeria 
NEWS

Conservation foundation urges businesses to champion environmental sustainability, biodiversity in Nigeria 

by NewsDen Publishers
September 19, 2026
Next Post
Oborevwori Gets Approval To Appoint 20 Special Advisers 

Oborevwori Set To Inaugurate Board Members Of Eight Agencies

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

I agree to the Terms & Conditions and Privacy Policy.

LATEST

Oborevwori To Swear In New Set Of Political Appointees 

Oborevwori To Swear In New Set Of Political Appointees 

September 21, 2026
Oborevwori Celebrates Oluremi Tinubu at 66, Hails Support for Vulnerable Nigerians

Oborevwori Celebrates Oluremi Tinubu at 66, Hails Support for Vulnerable Nigerians

September 21, 2026
Fr. Mozia Urges Christians To Align Their Will With God’s Will

Fr. Mozia Urges Christians To Align Their Will With God’s Will

September 20, 2026
2027: Ndokwa Nation Adopts Tinubu, Oborevwori, Okowa, Other APC Candidates

2027: Ndokwa Nation Adopts Tinubu, Oborevwori, Okowa, Other APC Candidates

September 19, 2026
Conservation foundation urges businesses to champion environmental sustainability, biodiversity in Nigeria 

Conservation foundation urges businesses to champion environmental sustainability, biodiversity in Nigeria 

September 19, 2026

TRENDING STORIES

  • Oborevwori Celebrates Oluremi Tinubu at 66, Hails Support for Vulnerable Nigerians

    Oborevwori Celebrates Oluremi Tinubu at 66, Hails Support for Vulnerable Nigerians

    0 shares
    Share 0 Tweet 0
  • Fr. Mozia Urges Christians To Align Their Will With God’s Will

    0 shares
    Share 0 Tweet 0
  • 2027: Ndokwa Nation Adopts Tinubu, Oborevwori, Okowa, Other APC Candidates

    0 shares
    Share 0 Tweet 0
  • Delta Govt Condemns Effurun Violence, Demands Free Campaigns

    0 shares
    Share 0 Tweet 0
  • Oborevwori Pledges Infrastructure Boost To Drive Delta Agriculture

    0 shares
    Share 0 Tweet 0
  • Oborevwori’s Aides To Attend Seminar

    0 shares
    Share 0 Tweet 0
  • 2026 BUDGET ADDRESS BY HIS EXCELLENCY, RT HON. (ELDER) SHERIFF F.O. OBOREVWORI, GOVERNOR OF DELTA STATE, TO THE DELTA STATE HOUSE OF ASSEMBLY ON WEDNESDAY, NOVEMBER 26, 2025.

    0 shares
    Share 0 Tweet 0
  • 60th Birthday: Oborevwori Pays Glowing Tributes To Mrs. Aguariavwado

    0 shares
    Share 0 Tweet 0
  • ​After U.S. Imposed Restrictions On Supply Of JDAM, Israel Began To Make Its Own Analogue

    0 shares
    Share 0 Tweet 0
  • YAGEP Gave Me A Successful Story – Eluro

    0 shares
    Share 0 Tweet 0
  • HOME
  • ABOUT US
  • CONTACT US

© NEWS DEN Since 2020 - Published by: GOLDSON'S RESOURCES.

No Result
View All Result
  • Home
  • NEWS
    • NIGERIA
    • AFRICA
    • WORLD
  • POLITICS
  • SHOWBIZ
  • EDUCATION
  • BUSINESS
  • HEALTH
  • TECHNOLOGY
  • SPORTS
  • OPINION
  • MORE
    • FEATURES
    • INTERVIEWS
    • RELIGION
    • RELATIONSHIP
    • VIDEOS

© NEWS DEN Since 2020 - Published by: GOLDSON'S RESOURCES.